Power built for
what comes next.

Power Velocity Infrastructure develops behind-the-fence power solutions across Ontario — pairing gas-fired generation assets directly with large compute and industrial loads. No grid bottlenecks. No interconnection queues.

15+
Years in infrastructure
40–120MW
Phase 1 target per site
BTF
Behind-the-fence model
ON
Ontario-focused pipeline

Grid-independent power
for large-load operators

Ontario's grid capacity constraints are a growing obstacle for energy-intensive industries. Interconnection queues stretch years. Transmission upgrades lag demand by a decade.

Power Velocity's approach removes the grid from the equation — connecting verified gas-fired generation assets directly to high-load tenants through a Behind-the-Fence arrangement. The tenant executes a direct PPA with the generator. Power Velocity delivers the land, zoning, fibre, and development management.

The result is a power delivery path measured in months, not years — with certainty of supply, bankable commercial terms, and sites engineered for industrial-grade uptime.

01

Site Identification & Qualification

Each site is selected against a strict BTF-eligibility framework — verified generation capacity, correct zoning, transmission avoidance, and regulatory positioning assessed before any commercial engagement.

02

Generation Asset Alignment

We work directly with gas generation operators to structure private wire arrangements that deliver power at the fence line under long-term, commercially bankable terms. No OEB retailer licence required — tenant executes PPA directly with generator.

03

Infrastructure Packaging

Beyond power, we confirm diverse fibre paths — 100G/400G capable, connecting to major long-haul corridors — alongside water, road access, and zoning certainty. Everything a hyperscale tenant needs to underwrite a site.

04

Commercial Execution

Site control, ground lease or land purchase, power purchase framework, and full infrastructure coordination — from land identification to energized fence line. We act as developer of record throughout.

The access others
don't have.

Fifteen years inside carrier and data centre infrastructure gives us a different starting point than developers who approach this from the real estate or finance side.

Operator-level credibility

We speak the language of data centre operators, utility engineers, and IESO processes — giving us access to conversations that generalist developers don't reach.

Ontario-rooted site network

Our site pipeline is built on real relationships with municipalities, regional economic development offices, and generation asset owners across Ontario.

BTF-first structuring

Every site is evaluated against a BTF-eligibility framework from the outset — not retrofitted. Correct zoning, generation proximity, and transmission avoidance assessed before any engagement.

Fibre diversity built in

Diverse carrier paths on 100G/400G long-haul routes are confirmed as part of site qualification — not an afterthought. Critical for hyperscale underwriting criteria.

Municipality relationships

Direct engagement with Township and regional EDOs from day one — sites positioned within communities before they become public, not after opposition forms.

Clean commercial structure

Structured as a land developer and infrastructure packager. No OEB retailer licence required. Tenant-to-generator PPA model eliminates regulatory complexity for all parties.

Multiple sites across
Ontario, in development.

Our pipeline focuses exclusively on BTF-eligible locations — sites with verified generation capacity and a clear path to large-load delivery. Site-specific details available under NDA.

Priority Site

Southwestern Ontario Corridor

Lambton Region, Ontario

A high-potential generation corridor in Southwestern Ontario with significant gas-fired capacity exceeding 1,000 MW. Priority parcels are on correctly zoned industrial land — no rezoning required. Diverse fibre paths on 100G/400G capable long-haul routes being confirmed. Exceptional fundamentals for large-scale compute deployment.

1,000+ MW generation-adjacent
Dual carrier fibre paths — 100G/400G
Industrial zoning confirmed
40–120 MW Phase 1, expandable
In Evaluation

Eastern Ontario

Ottawa–Napanee Corridor

Eastern Ontario is an emerging data centre destination supported by provincial infrastructure, proximity to federal demand anchors, and available land with improving power access. We are tracking BTF-compatible generation assets in this corridor for medium-to-large load deployment.

Generation matching underway
Multiple locations under evaluation
Federal demand proximity

Additional BTF-eligible sites across Ontario are under NDA or in early diligence — evaluated in partnership with regional economic development offices and generation asset operators. Contact us for current availability.

Request Site Package

Thinking on power,
land & infrastructure.

Weekly articles on the BTF model, Ontario energy markets, and the infrastructure realities behind data centre development — published on LinkedIn.

Latest Article

How Behind-the-Fence Power Changes the Data Centre Development Equation

Why BTF arrangements from gas generation assets are unlocking sites that the traditional grid-connect model can't serve — and what that means for Ontario.

Read on LinkedIn
Previous Article

Ontario's Power Bottleneck Is a Methodology Problem, Not a Capacity Problem

The province has significant generation in the ground. The challenge is connecting it to demand — and where private wire thinking creates a new path forward.

Read on LinkedIn
Previous Article

Fibre Is the Hidden Gating Factor in Canada's AI Data Centre Buildout

Power gets all the attention, but diverse carrier-grade fibre connectivity is increasingly the criterion that separates viable hyperscale sites from everything else.

Read on LinkedIn

Founded on
fifteen years inside the industry.

Power Velocity Infrastructure is an Ontario-incorporated data centre land development company focused exclusively on Behind-the-Fence power solutions for high-load users.

Our founder brings 15 years of carrier and data centre infrastructure experience working across major Canadian and US operators. That depth of operational knowledge shapes every aspect of how we identify sites, structure power arrangements, and engage with tenants.

We are not a real estate company that discovered data centres. We are infrastructure operators who understand the power problem from the inside.

"The power problem in data centre development is not a real estate problem. It is an infrastructure knowledge problem. We solve it from the inside out."

— Pawan Pahuja, Founder & Principal, Power Velocity Infrastructure
15+ years carrier & DC infrastructure
Power Velocity Infrastructure Corp. Ontario
Active municipal & EDO relationships
Direct generation asset relationships Engaged with Ontario gas-fired generation operators across corridor
NDA-governed site packages Site-specific details available to qualified counterparties under NDA

Start a
conversation.

Whether you are a data centre operator seeking power-ready land, an investor evaluating the BTF opportunity, or a generation asset owner looking for a development partner — we want to hear from you.

Site-specific details including parcel information, generation capacity, and power pricing are available to qualified counterparties under a standard bilateral NDA.

Registered
Ontario, Canada · Corp. #1001598029
Site-specific information including parcel details, generation capacity, and power pricing is provided to qualified counterparties under a standard bilateral NDA.